Azure Power Global Limited, as an independent solar power producer in India, today announced its consolidated results under United States Generally Accepted Accounting Principles ("GAAP") for the fiscal fourth quarter ended March 31, 2020.
Fiscal Year and Fourth Quarter 2020 Period Ended March 31, 2020 Operating Highlights:
Key Operating Metrics
Electricity generation during the quarter and year ended March 31, 2020 was 868 million kWh and 2,870 million kWh, respectively, an increase of 343 million kWh or 65%, over the quarter ended March 31, 2019, and an increase of 1,136 million kWh, or 66%, over the year ended March 31, 2019. The increase in electricity generation was principally a result of additional operating capacity during the period driven by the commissioning of new projects. Our Plant Load Factor ("PLF") for the quarter and the year ended March 31, 2020, was 22.3% and 19.5%, respectively, compared to 20.5 % and 18.6%, respectively, for the same comparable period in 2019.
During the fiscal year, we completed 367 MWs (AC) and 610 MWs (DC). During the fourth quarter, 4 MWs (AC) and 11 MWs (DC) were put into operation. Project cost per megawatt operating consists of costs incurred for one megawatt of new solar power plant capacity during the reporting period. The project cost per megawatt (DC) operating for the year ended March 31, 2020 decreased by INR 5.2 million (US$ 0.07 million), or 13%, to INR 35.5 million (US$ 0.47 million) primarily due to lower costs on account of the reduction in solar module prices for the projects commissioned during the period. The project cost per megawatt (AC or megawatt capacity per the PPA) operating for the year ended March 31, 2020 was INR 48.9 million (US$ 0.65 million), compared to INR 50.4 million, for the year ended March 31, 2019, on account of the reduction in solar module prices which was partially offset by additional safeguard duties paid by the Company. Excluding the impact of safeguard duties, the DC and the AC costs per megawatt for fiscal year 2020, would have been lower by approximately INR 2.9 million (US$ 0.04 million) and INR 4.9 million (US$ 0.07 million), respectively.
As of March 31, 2020, our operating and committed megawatts increased by 3,759 MWs to 7,115 MWs compared to March 31, 2019. 2,000 MWs of Committed Capacity is a greenshoe option that has been exercised by the Company as part of an auction that was won but this capacity has yet to receive a Letter of Award.
The Insight Partners is a one stop industry research provider of actionable intelligence. We help our clients in getting solutions to their research requirements through our syndicated and consulting research services. We specialize in industries such as Semiconductor and Electronics, Aerospace and Defense, Automotive and Transportation, Biotechnology, Healthcare IT, Manufacturing and Construction, Medical Device, Technology, Media and Telecommunications, Chemicals and Materials.
Severity: Warning
Message: count(): Parameter must be an array or an object that implements Countable
Filename: amp/news_details_amp.php
Line Number: 252
Backtrace:
File: /home/smartmarketnews/public_html/application/views/amp/news_details_amp.php
Line: 252
Function: _error_handler
File: /home/smartmarketnews/public_html/application/controllers/Amp_controller.php
Line: 41
Function: view
File: /home/smartmarketnews/public_html/index.php
Line: 315
Function: require_once
Smarter Decisions with Smart News
Smart Market News is committed to getting its readers the latest updates and insights on industries that help in making “smarter” business decisions. With insights and inputs from corporate decision makers, we bring you the stories of adopting innovative solutions and strategies that have been changing the world. Our editorial insights on products, solutions, companies, and adoption of best practices not only help in understanding the markets better, but also prove to be a complete package for your information needs.
media@smartmarketnews.com | sales@smartmarketnews.com
Contact Us