Shanghai Electric Resumes Construction at Major International Projects, Empowered by "Desert Roses"

  • Published Month : Friday, 13 Mar 2020 12:00 pm

In Shanghai Electric, 19.9 percentage of the positions are held by women, which is surpassing the global female participation rate in the industry at 12% as shown in "The Future of Women at Work" report by consultancy firm McKinsey.

Shanghai Electric Group ("Shanghai Electric" or "the Company"),  a manufacturer and supplier of power generation and industrial equipment, one-stop energy solution provider, has resumed construction at majority of its International projects including the 700 MW CSP + 250MW PV Hybrid Project in Dubai, the Pancevo Gas Turbine Combine Cycle Power Plant in Southeastern Europe, and Sylhet 225MW Combined Cycle Gas Turbine Power Plant Project in Bangladesh.

As the world's most comprehensive single-site CSP project, its core building solar collector tower that has just completed topping-out in January 2020, Dubai 700 MW CSP + 250MW PV Hybrid project concentrated solar power plant has been speeding up its construction to meet the commercial operation deadline in August 2021.

To overcome the challenges of the outbreak of the Coronavirus, Shanghai Electric has launched a video-conferencing and telecommunications solution to streamline communications between the local branch and the Design Institute.

Since January this year, Shanghai Electric has worked with local partners to establish a specialist virus prevention and control team to protect staff while working on-site. The local-hired personnel received fact sheets and advisory handbooks with on-site safety training in both English and Arabic.

Mr. Abunayyan, Chairman of ACWA Power, has commended the achievement of the government of China in controlling and managing effectively the widespread of Coronavirus. He also emphasized the achievement of Shanghai Electric in controlling the project site and working on mitigation actions for possible damages and to catch up with work schedule.

"Readiness is the outcome of preparedness, therefore it's significant for Shanghai Electric to allocate resources, deliver timely training, and build a system to improve operational capacity based on risk assessments." Said Zhao Hui, the manager of Dubai project. As part of the system, the UNESCO's Sustainable Development Goals (SDGs) is implemented across all projects conducted by Shanghai Electric, with Shanghai Electric Dubai holding regular HSE safety drills for unforeseen events.

The project has also recruited an additional 903 local employees in construction and management positions in response to a reduction of on-site staff as a result of global travel restrictions.

"We are likely to go ahead of the timetable in extending local talent pool as an outcome of the epidemic outbreak. " said Zhao Hui.

"People are the main force for resuming to normal work. There are 70 Chinese workers who remain working on-site amid the virus outbreak and 10 of them are female. I am particularly grateful to the female workers as they are the well-deserved "desert roses" who entirely act out the spirit of #Each for Equal" said Zhao Hui.

There are 24 female workers in the Dubai project and almost half of them remain working on-site during the epidemic outbreak.

"I choose to stay despite the fear." Said Guo Liming, engineer of Dubai project, also one of the female workers remain on site in Dubai project. " Our team has been working to turn the desert into oasis and I am proud to be part of it ".

In Shanghai Electric, 19.9 percentage of the positions are held by women, which is surpassing the global female participation rate in the industry at 12% as shown in "The Future of Women at Work" report by consultancy firm McKinsey.

"Shanghai Electric recently launched a commendable contribution campaign to help those in need at China. We as a project team has been stronger than ever before, fighting the unfortunate turn of events with all necessary control measures in place. Alone, we can do so little but together we can do so much", said Amreena, the HSE engineer in Dubai.

About The Insight Partners:

The Insight Partners is a one stop industry research provider of actionable intelligence. We help our clients in getting solutions to their research requirements through our syndicated and consulting research services. We specialize in industries such as Semiconductor and Electronics, Aerospace and Defense, Automotive and Transportation, Biotechnology, Healthcare IT, Manufacturing and Construction, Medical Device, Technology, Media and Telecommunications, Chemicals and Materials.

A PHP Error was encountered

Severity: Warning

Message: count(): Parameter must be an array or an object that implements Countable

Filename: amp/news_details_amp.php

Line Number: 252

Backtrace:

File: /home/smartmarketnews/public_html/application/views/amp/news_details_amp.php
Line: 252
Function: _error_handler

File: /home/smartmarketnews/public_html/application/controllers/Amp_controller.php
Line: 41
Function: view

File: /home/smartmarketnews/public_html/index.php
Line: 315
Function: require_once

Smarter Decisions with Smart News

Smart Market News is committed to getting its readers the latest updates and insights on industries that help in making “smarter” business decisions. With insights and inputs from corporate decision makers, we bring you the stories of adopting innovative solutions and strategies that have been changing the world. Our editorial insights on products, solutions, companies, and adoption of best practices not only help in understanding the markets better, but also prove to be a complete package for your information needs.

media@smartmarketnews.com | sales@smartmarketnews.com

Contact Us
Visit Our Sites
© The News and Media Division of The Insight Partners 2019 | All Rights Reserved | Privacy Policy